The Puerto Rico Project
Author:
Release time: 2025-03-18 19:15:09
View number: 36
Puerto Rico Project
Project Overview:
Project Features:
The first commercial VSG project in the United States, a classic application of island microgrids
The only one in the world that has achieved the calculation of gas generator curves based on voltage and frequency changes
Effectively address the challenges of insufficient inertia and difficult monitoring of gas generator sets, and achieve it effectively
Got VSG support
The C&I project features off-grid and grid-connected switching, advanced monitoring algorithms, and operates 24/7 without interruption
It operates and meets the requirements of high reliability
Project scale: 3.6MW/3.06MWh
Construction site: Puerto Rico
Application scenario: Microgrid
Operation time: 2022.